REE’s site personnel were nominated for a Rio Tinto Bravo award certificate of recognition for design services provided for the redesigning the area around the RMA discharge drain and constructing the Falls Diversion, directing the discharge away from the thickener pipework eliminating any risk of personnel being covered with discharge when operating the deposition line flushing valves.